projects FEATURED CASE STUDIES

Projects » 

Beach Approach Image Beach Approach

ECI completes 7 beach approaches for a total of 25,000 feet installing 6 5/8 inch conduit as part of Hawaiian Islands - Inter-Island Undersea Fiber Optic Network.

River Crossing Image River Crossing

ECI completes 2,668 foot river crossing and pulls into place a 24-inch diameter water main installed 30 feet under the river bottom. The pipe string weighs an estimated 300,000 pounds (empty) and is one of the largest horizontal directional drilling (HDD) projects ever undertaken in Michigan.

River Crossing Image River Crossing

ECI completes 4280 foot crossing under the St. Lucie River and installs a 30 inch force main. The project team received "Project of the Year" award from the Florida Institute of Consulting Engineers.

Mississippi River Crossing Image Mississippi River Crossing

ECI loosens a drill pipe abandoned by a previous driller, reams the hole and successfully installs a 12-inch steel product pipe 4994 feet under the Mississippi River.

Beach Approach Image Beach Approach

Our beach approach technique features drilling from land out to sea. To install conduit, designed to receive ocean utility cables. This study explores the third ECI project on Long Beach Island, New Jersey.