River Crossing
ECI completes 2,668 foot river crossing and pulls into place a 24-inch diameter water main installed 30 feet under the river bottom. The pipe string weighs an estimated 300,000 pounds (empty) and is one of the largest horizontal directional drilling (HDD) projects ever undertaken in Michigan.
|
River Crossing
ECI completes 4280 foot crossing under the St. Lucie River and installs a 30 inch force main. The project team received "Project of the Year" award from the Florida Institute of Consulting Engineers.
|
Mississippi River Crossing
ECI loosens a drill pipe abandoned by a previous driller, reams the hole and successfully installs a 12-inch steel product pipe 4994 feet under the Mississippi River.
|
River Crossing
ECI completes 4400 foot crossing under the St. Lucie River and installs water pipeline in Martin County, Florida.
|
River Crossings
Numerous river crossings have been performed to install utilities under environmentally sensitive waterways. This crossing under the St. Joseph's River features installing multiple conduit for communications utilities.
|